the watershed co-housing project | multi-unit residential 6-plex
Location: Guelph, ON
Construction Cost: ~$4,500,000
Consultant: J. David McCauley Architect Inc. | Tacoma Engineers. Inc.
The Watershed Co-Housing project entails the construction of a three-story multi-unit residential building designed under Passive House principles. This design prioritizes high-performance assemblies, which enhance insulation, achieve airtight detailing, and optimize mechanical systems. Such an approach aims to minimize energy consumption while maximizing occupant comfort.
The project scope encompasses the demolition of existing structures, comprehensive site servicing (including sewer, stormwater, water, and hydro), superstructure construction, and essential tie-ins to adjacent buildings. Our team effectively managed all construction trades from project inception to final completion, which included municipal infrastructure elements such as paving, sidewalks, and curbs. This thorough management ensured a seamless and resilient project that adheres to stringent standards of efficiency and durability.
Innovative co-housing projects, like this one, are gaining popularity as an aging population seeks community-oriented, energy-efficient, comfortable, and healthy living environments. Frontiers has been approached for several upcoming projects that embody this community-focused fabric. Notably, we have recently been awarded a project from Wyndham House, a not-for-profit organization developing a 10-bedroom facility on Waterloo Avenue in Guelph, which will begin pre-construction shortly, with construction set to commence in May 2025.
The Watershed Co-Housing project team was assembled 18 months before the anticipated start date to continue planning and refining the design. The main stakeholder, J. David McCauley, served as both the developer and architect. The team also included structural, mechanical, electrical, and civil engineers, as well as a construction management firm. Due to the project’s location in a dense residential area, numerous complications arose that required input and solutions from all consultants. The primary challenges during the planning phase involved proximity to neighboring property lines, necessitating the use of non-combustible materials for a significant portion of the building, as well as site servicing and drainage.
Through extensive meetings and drawings for conflict resolution, the team successfully addressed these challenges to mitigate potential change orders or complications during construction. Although primarily new construction, the project also involved an addition to an existing century home. Integrating structural, infrastructure, mechanical, and electrical components between the new and old structures presented a particular challenge. However, the team’s cohesiveness and the allocated planning time resulted in a high-performing, seamless integration.