Most homeowners think hiring a contractor is like shopping for a TV—you find the model you want and look for the lowest price. Contractors often let you believe this, but here is the truth they won’t tell you:

Professional contracting is a commodity business.

We all hire from the same labour pool and pay similar competitive wages. We all buy the same 2x4s, plumbing fixtures, and shingles from the same local suppliers. We all operate on similar overhead structures, typically applying a 10% to 20% markup to cover our management and profit.

If two professional, legitimate companies provide a proposal for the exact same scope of work, there should be no more than a 10% variance in price.

The “Apples to Oranges” Trap

When you see a price gap larger than 10%, you aren’t looking at a “better deal.” You are looking at a different—and often inferior—product.

Consider the Car Comparison:

FeatureDealership ADealership B
Requirements4 Doors, 4 Wheels, White4 Doors, 4 Wheels, White
Quote$30,000$25,000
The ResultHigh-end tires, factory sunroof, fully insured.Temporary “donut” tires, no sunroof, uninsurable.

The Reality of the “Cheap” Option:

The buyer chose Dealership B to save $5,000. However, they soon realized the car couldn’t be insured without new tires. They spent $7,000 sourcing parts and having a sunroof cut in after the fact.

The Final Toll: * Total Cost: $32,000 (More expensive than the “high” bid).

  • The Headache: Days of wasted time and a sunroof that now leaks because it wasn’t factory-installed.

How This Happens in Construction

When a contractor is significantly cheaper, they aren’t “taking less profit”—they are cutting corners you can’t see yet, or there is a difference in the scope of work being provided

  • Materials: Using “builder grade” products that fail in 10 years instead of 50.
  • Protection: Skipping proper floor protection, dust containment, or liability insurance.
  • Subcontractors: Using unlicensed or inexperienced labour to shave costs.
  • Scope: Intentionally leaving out “hidden” requirements (like permits or debris removal) only to hit you with Change Orders later.
  • Inexperience: They may have missed substantial scope required for the project, applying major risk to the budget, timeline and success of the project.

The Bottom Line

If a proposal looks like a steal, you’ll likely pay for it later in stress, repairs, change orders and lost time. Don’t bid for the lowest price. Bid for the most complete scope. — Work with a partner who gives you the full picture upfront. No hidden costs, no surprises.